Underground Car Parking Facility at Beirut International Airport, Lebanon.
Contract Value: US$ 17,750,000
This is a Build, Operate and Transfer (BOT) Project consisting of an Underground Parking Facility comprising 2,350 car parking spaces covering 2 floors underground and a surface area. Facilities also include a Tunnel connecting the Car Park to the Terminal Building, a Fire Detection System and fire Fighting Equipment, Ventilation System, Elevators, Public Bathrooms, Offices, control Centre, both building & Parking Management System, Pumps and other related works. The operation includes all aspects of setting up the procedures and implementing and maintaining a Quality System (ISO 9001:2000).
Client: Investment Development Authority of Lebanon. Start: 1998
Consultant:Dar Al-Handasah, Beirut. Completion:2001


 
Luxury Villas Project, Albania.
Contract Value: US$ 4,000,000
This BOT project comprises the construction of 10 Deluxe Standard villas complete with all amenities, luxury furniture and fittings, Air Conditioning System, Access Roads, Paving, Street Lighting, Car Parking Facilities and Swimming Pool located in the National Park.
Client: MAK-Albania S.h.p.K, Tirana. Start: 1993
Consultant:M.A.Kharafi Engineers, Kuwait. Completion:1994


 
Chateau Linz Motel & Restaurant, Albania.
Contract Value: US$ 6,500,000
Scope of works for this BOT includes the construction of a 22 room Motel with a Swimming Pool an a Five Star Restaurant with a seating capacity for 130 persons and all other related works, the area covers 10,000m2.
Client: MAK-Albania S.h.p.K., Tirana. Start: 1994
Consultant:M.A. Kharafi Engineers, Kuwait. Completion:1995


 
Coral Beach El Montazah , Sharm El Sheikh, Egypt.
Contract Value: US$ 15,050,000
This BOT project involves the construction of a 140 room Hotel facility complete with Main Building, Health Club, Electricity Building, Food & Beverage Building, 3 Villas and a Swimming Pool of 1,100m2 plus all other related works.
Client: EMAK Sharm El-Sheikh for Tourism Development, Cairo. Start: 1996
Consultant:Cairo Group for Design, Egypt. Completion:1999

 
Coral Beach Al-Arish Resort, Egypt.
Contract Value: US$ 16,800,000
A BOT project consisting of the construction of a hotel facility with 70 rooms consisting of a Main Building, Health Club, Recreation Building, Restaurant, Swimming Pool (1,100m2) and an Artificial Lake (23,000m2) as well as all other related works.
Client: EMAK Al-Arish for Tourism & Development, Cairo. Start: 1997
Consultant:Group Architects International Design, Egypt. Completion:2000


 
Coral Beach Resort Hurghada, Egypt.
Contract Value: US$ 6,000,000
A BOT project involving the construction of a Resort Hotel on the Red Sea, Built over an area of 800,000m2 with a 1,200 metre beach front and 298 separate guest chalets including 6 suites and 40 family units as well as all other related works.
Client: MAK for Tourism Development, Egypt. Start: 1993
Consultant:MAK for Tourism Development, Egypt. Completion:1995


 
Sheraton Hotel, Pretoria, South Africa.
Contract Value: US$ 14,500,000
Scope of works for this BOT project consists of the construction of a Luxury 5-Star Hotel consisting of 175 Standard Rooms, 36 Tower Rooms, 7 Diplomatic and 9 Junior Suites and a Presidential Suite. All rooms have Individually Controlled Air Conditioning, Color Television with Satellite and Pay –TV, Voice Mail, Sound Proof Insulated Windows, Mini-bar, Personal Safes plus there are 9 Smart Rooms with Internet Facilities. Tower Floors and Suites are on the 6th & 7th Floors and can only be reached through a special lift key with also a Special Check-in Facility and Lounge. The hotel also features a Conference Hall, Meeting Rooms (7off), Swimming Pool & Terrace with Pool Deck Bar, Gymnasium, Restaurants (2off), Bar & Coffee Shop and Nightclub.
Client: MAKHOSI Projects (Pty) Ltd., Pretoria. Start: 1997
Consultant:BSK Structural Engineers/Hannes Meiring Architects. Completion:1999


 
Touristic Village at Golem Beach, Albania.
Contract Value: US$ 8,000,000
This BOT project consists of the construction of a tourist village covering an area of 80,000m2 incorporating a Beach area as well as 30 Apartments, 30 Cabins, Restaurant (200 persons), a Motel with 100 rooms, Swimming Pool, open Theatre, Disco and Amusement Park as well as all other related works.
Client: MAK-Albania S.h.p.K., Tirana. Start: 1996
Consultant:MAK-Albania S.h.p.K., Tirana. Completion:1997

 
Sulaibiya Wastewater Treatment & Reclamation Plant (BOT Project), Kuwait.
Contract Value: US$ 500,000,000
Project involves the complete design, construction and operation of the Wastewater and Reclamation Plant currently handling 350,000m3 of wastewater but designed for future expansion to process up to 600,000m3. The plant includes both conventional and non-conventional processes including a Membrane Separation Process, Pre-treatment Plant, Interconnecting Pipe Work, Switchgear, Transformer, Cabling, Controls and Instrumentation, Biological and Chemical Analysis Laboratories, Civil engineering Works comprising plant foundations, water storage tanks, buildings (total no. 30), roads and all other associated works and equipment. Civil works consists of construction of a totally new Plant at Sulaibiya and the necessary extension ( 3 off 25KM Ductile Iron Pipelines 1400mm dia.) from the Ardiya Plant.
Client: Utilities Development Company, Kuwait. Start: 2002
Consultant:Utilities Development Company, Kuwait. Completion:2004


 
Four Seasons Hotel, Beirut, Lebanon.
Contract Value: US$ 48,600,000
The scope of works includes the general construction including below and above Grade Structure Finishing, Electro-Mechanical Works, Water Proofing, Exterior Enclosure and site improvements and finishing’s as well as all other related works.
Client: Kingdom Beirut, Lebanon. Start: 2004
Consultant:Dar Al-Handasah Consultants, Beirut. Completion:2007

 
Annex to the Four Points Sheraton Hotel, Lebanon.
Contract Value: US$ 500,000
A project consisting of an annex to the existing hotel with a total built up area of 1,800m2 and including a Basement Floor as parking, an Underground Floor comprising an Entrance Area, Preparation Area, Outdoor Activities Area (Loggia, Terraces, Diwaniya, Swimming Pool, Kids Pool, Solarium and Stage. The Ground Floor includes a Pantry Area, Public toilets, Lockers, Showers and a tunnel connecting to the main hotel.
Client: MAK Hospitality & Touristic Investment S.a.r.L., Lebanon. Start: 2002
Consultant:Paul Antonios / Rais & Jamal, Lebanon. Completion:2002